Investigate
Evidence is missing or ownership is unclear. Assign an owner and collect the minimum evidence needed for the next decision.
Migration
Map your cryptographic dependencies, prioritize what matters, evaluate supported options, and validate changes before planning a staged rollout.
Migration involves systems, protocols, vendors, and operations—not simply replacing an algorithm.
This page describes a general migration approach. Evolext currently focuses on research, assessment, and controlled laboratory prototypes. Production changes require separately agreed engineering and validation.
Identify cryptographic use, owners, dependencies, and evidence gaps.
Review data lifetime, business impact, exposure, and vendor constraints.
Check standards, protocol support, and implementation maturity for the selected use case.
Test interoperability and operational behavior in an isolated environment.
Define monitoring, acceptance criteria, rollback conditions, and remaining risks.
Evidence is missing or ownership is unclear. Assign an owner and collect the minimum evidence needed for the next decision.
Compatibility, performance, or failure tests miss the agreed criteria. Change the candidate and repeat the relevant tests.
A required vendor or protocol path is not supported. Record dependencies, interim controls, and a review trigger.
No acceptable recovery path, authorization, or supported design is available. Record the reason rather than presenting the path as ready.
These are responsibilities to assign within an engagement; they do not imply that Evolext supplies every role or approves production changes.
Fictional example · no measured results or client evidence
Assume two services communicate in an isolated test environment, with named owners and approved test data. Actual protocol and vendor support remain to be verified.
List both endpoints, client libraries, trust dependencies, and evidence gaps.
Review data lifetime and business impact before placing this connection on the investigation list.
Compare staying with the current configuration, a supported hybrid option, and a supported post-quantum option; do not select an unsupported combination.
Prepare a test matrix; measure compatibility and operational effects rather than assuming success.
Draft rollout and recovery gates only if the reviewed evidence supports moving forward.
Use primary guidance and the applicable protocol and implementation documentation. Algorithm standardization, vendor support, and observed test behavior are separate evidence levels. Check publication updates and errata before making implementation decisions.
NCCoE guidance informs discovery and migration planning. FIPS 203, 204, and 205 define ML-KEM, ML-DSA, and SLH-DSA algorithm standards respectively; they do not establish protocol, vendor, or system readiness. Applicable references and implementation limits must be recorded for each engagement. References are not certification.
Last reviewed:
Evolext work is research-, assessment-, and prototype-stage. Guidance and source findings do not establish production readiness, compliance, or universal security.
No. Plan bounded increments around dependencies, data lifetime, and operational constraints. The sequence should follow reviewed evidence, not a universal schedule.
Yes. Inventory, prioritization, and vendor questions can begin first. Do not treat an unavailable implementation path as deployable; record when to revisit it.
When a defined protocol and supported implementation combine classical and post-quantum mechanisms in a way suitable for the use case. Evaluate its actual specification, interoperability, security review, and operational costs; do not invent a custom combination.
Record the failure and unmet criteria. Investigate, revise, defer, or stop, then repeat relevant tests if the candidate changes. A negative result is useful evidence.
No. Keys, certificates, persisted data, and trust relationships may require explicit recovery or transition measures beyond a software rollback. Establish those constraints before deployment planning.
A laboratory result demonstrates only the tested conditions. Production decisions also require supported integrations, operational controls, authorized change, recovery planning, and appropriate independent review.
Tell us which system or migration decision you want to explore. Keep the first inquiry high-level; do not submit credentials, private keys, secrets, or confidential reports.
Submitted contact details are stored in Supabase, and notifications may be sent through LINE.